Almost every expensive IT problem in a new office traces back to a decision nobody made early enough. This is the sequence we walk clients through, ordered by when it has to happen.

Before the lease is signed

During design — before walls close

This is the window where everything is cheap. Once drywall is up, the same work costs multiples.

Six to eight weeks before move-in

Two to three weeks out

The week of the move

Test everything with real users before they depend on it. Walk the wireless with a laptop and a phone. Call every extension. Badge every door. Print from every workstation. The problems you find on Thursday are inconveniences; the same problems on Monday are a crisis.

The mistake that costs the most

Treating IT as a move-in task rather than a design task. The low-voltage scope belongs in the drawings alongside electrical and mechanical. When it is added after construction, you pay for cored concrete, surface raceway and a second mobilization — for infrastructure that would have cost a fraction if it had been on the plan.

Building out or relocating? We do the whole scope as one project — office IT buildouts, structured cabling, wireless, phones and access control. Call (833) 306-3168 with the drawings.