Campus and multi-building fiber backbones installed with microduct and air-jetting — fiber carried by compressed air through duct at 150+ feet per minute, around bends, for runs into the thousands of feet. Duct once, blow fiber whenever you need more.

One crew, one quote, and none of the “that’s not in scope” surprises. Here’s what a ClearMax fiber optic installation & jetting job includes.
We map the run — buildings, handholes, entries, bend counts — and design the duct route before anything goes in the ground.
Microduct laid in trench, bored path, or existing conduit — the pathway that makes future fiber a blow-in, not a construction project.
Fiber carried through the duct on compressed air — smooth through bends, low strain on the glass, thousands of feet in a run.
Spliced, terminated, and dressed in panels at both ends — done to spec, not to “it lights up.”
Every strand shot with OTDR and documented — you get the traces, not a promise.
Empty microducts in the same pull mean the next building or bandwidth jump is a jetting visit, not a new trench.
From first walkthrough to hand-off, you always know what’s next and what it costs.
Path walk, utility locates coordinated, entries and splice points planned — with permits scoped where required.
Pathway, fiber, splicing, and testing broken out by segment. Campus backbones are real projects — you’ll see exactly where the money goes.
Microduct placed, then fiber jetted through on compressed air — including future spare ducts while the ground is open.
Fusion-spliced ends, OTDR traces on every strand, as-builts delivered.
We install for specific industries and speak their software and compliance. Find your specialist page:
Line-by-line, so you know what every dollar buys.
No subcontractor roulette. One accountable team.
Hardware at our cost. We don’t mark it up.
Want us to keep it running? Roll it into managed IT.
Instead of dragging cable through conduit, a jetting machine feeds fiber into microduct while compressed air carries it along — 150+ feet per minute, gentle on the glass, smooth through bends, with single runs reaching thousands of feet.
Less strain on the fiber, longer continuous runs, and the big one: once your microduct is in, adding or upgrading fiber later is a quick blow-in instead of re-trenching your property.
Anywhere from linking two buildings to full campus backbones across many acres. Cost scales with pathway distance, construction conditions, and strand counts — we quote by segment so the scope is transparent.
Underground work means utility locates and, on some routes, permits — we coordinate both as part of the project rather than leaving them to you.
Tell us about your space in Columbus or Nashville. We’ll follow up with a flat, itemized quote — usually same day.
ClearMax Labs — install and managed IT for business across Columbus, OH and Nashville, TN.