New server room or a mess you inherited — we rack, cable, and power your network gear so it’s clean, cool, and serviceable. Switches, firewalls, patch panels, UPS — mounted and dressed the way it should be.

Akron IT rooms inherit their buildings’ industrial quirks — mezzanine corners in old plants with dust and vibration, basement rooms with humidity, closets that were literally closets when the lease was signed. Equipment fails early in those conditions, and it fails in ways that look like software problems. We rack and stack for the environment that actually exists: solid mounting, managed cable, right-sized UPS, and sensors that warn about heat and moisture before hardware quits.
Akron’s building stock is rubber-industry inheritance — thick-walled brick plants converted to offices and maker space, mill buildings with 16-foot ceilings and masonry that predates conduit, plus newer flex parks out toward Green and Fairlawn.
Dust and vibration shorten hardware life. Enclosed racks and filtration where the environment demands it.
Humidity is the silent killer. Monitoring and airflow planning before equipment goes in.
Rooms never designed for heat load. We size airflow to the actual equipment, not the square footage.
Conventional conditions — the work is organization, labeling, and UPS runtime matched to real load.
Electrical work follows NEC and local Summit County permitting, and dedicated circuits for rack power are worth doing properly rather than sharing an office branch circuit. Where equipment sits in a rated assembly or near egress, clearance requirements apply. We document circuit assignments so nobody discovers the hard way which breaker kills the server.
Gear on a wire shelf since 2015, rebuilt into a room a technician can service.
Moving a rack without losing a day, with a documented plan and labeled everything.
Right-sizing runtime to actual load and verifying it under test instead of trusting a label.
Downtown Akron · Fairlawn · Green · Cuyahoga Falls · Stow · Barberton · Copley · Montrose · Summit County
Akron sits about two hours from our Sunbury base, which puts Summit County inside our regional drive radius rather than our national dispatch tier. Design, engineering and project management come from our team directly; the hands on site are vetted Northeast Ohio installers we work with repeatedly rather than whoever a national marketplace assigns that week. That distinction matters most on the second visit — when something needs adjusting, the person who answers already knows your building.
One crew, one quote, and none of the “that’s not in scope” surprises. Here’s what a ClearMax rack & stack / server room buildout job includes.
Wall-mount or floor-standing racks installed, leveled, and secured for airflow and access.
Switches, firewalls, servers, routers, and NVRs racked with proper rail kits and spacing.
Cat6/6A punched down to labeled patch panels with clean, tested terminations.
Combed, bundled, and routed through vertical and horizontal managers — no rat’s nest.
Rack PDUs and UPS installed and load-balanced so a blip doesn’t take you down.
Every port, run, and device labeled, plus an as-built diagram you actually keep.
From first walkthrough to hand-off, you always know what’s next and what it costs.
We measure the space, plan rack layout, airflow, power, and cable paths before touching a screw.
Itemized flat quote covering gear mounting, termination, power, and documentation.
Equipment mounted, patch panels terminated, cable dressed, UPS and PDUs wired and tested.
Full labeling and an as-built diagram handed off — so the next person isn’t guessing.
We install for specific industries and speak their software and compliance. Find your specialist page:
Line-by-line, so you know what every dollar buys.
No subcontractor roulette. One accountable team.
Hardware at our cost. We don’t mark it up.
Want us to keep it running? Roll it into managed IT.
If it is a basement or a converted closet, yes. Heat and humidity kill hardware slowly and the failures look like random software issues. A sensor that texts you at 85 degrees costs less than one dead switch.
Yes. Rack rebuilds are usually staged so nothing critical goes down during business hours, with cutovers scheduled after close.
Photos, a labeled panel and circuit schedule, and documentation of what is plugged where. That packet is what makes every future service call short.
Tell us about your space in Columbus or Akron. We’ll follow up with a flat, itemized quote — usually same day.